Cloud Valley (The Cpmpany) Technology Co., Ltd.
date:2019-09-06 browser:135
Name of the Engineering: Secondary Distribution of C Package for the 6th Generation Active Matrix Organic Light Emitting Display (AMOLED) Panel Production Line
Project location of the Engineering: Hebei Province Gu’an New Industry Demonstration Zone
Construction Unit: Cloud Valley (The Cpmpany) Technology Co., Ltd.
Contract Amount: 31,000,000 Yuan
Responsible area: Outline of No. 3 building project: Power; vacuum system (PV); CDAulk Gas System; exhaust system; ultra pure water/de - ionized water system (UPW/DIW); process cooling water system (PCW); secondary distribution and installation of the drain system.
News
- L&K Engineering Awarded the Title of SMIC (Tianjin)’s 2022 Monthly Progress Model Award for Safety Production 2022年08月20日
- On the Journey with the Scorching Sun, the Cloud Helps Build the Future 2022年08月20日
- L&K Engineering Won the Awards of Excellent Safety Contractor and Outstanding Safety Contribution Contractor for Hangzhou Fullsem 2022年08月11日
- L&K Engineering ZJU-Hangzhou Global Scientific and Technological Innovation Center Project Awarded the Honorary Title of “Excel 2022年08月10日