| | English 前, 要设定延迟翻译时间, 如100表示100ms,默认为0 var cookieDomain = "http://hyu2902120001.my3w.com/"; //Cookie地址, 一定要设定, 通常为你的网址 var msgToTraditionalChinese = "繁體"; //默认切换为繁体时显示的中文字符 var msgToSimplifiedChinese = "简体"; //默认切换为简体时显示的中文字符 var translateButtonId = "translateLink"; //默认互换id translateInitilization();

HuaTian Technology(Kunshan)Electronics Co., Ltd.

date:2018-01-26    browser:82
Project name: No. 2 Plant of Kunshan Huatian Clean Room Decoration Project, and Mechanical and Electrical Installation Engineering of No.3 Power plant.
Engineering site: No. 112, Longteng Road, Economic-Technological Development Zone, Kunshan
Construction unit: HuaTian Technology(Kunshan)Electronics Co., Ltd.
Construction area: 37,212 m2
Building storey: 1 floor under the ground and 3 floors above the ground; Building height: 25 m
Structure type: reinforced concrete and frame-shear wall stiffness structure
Commencement date: December 30, 2003
Completion date: October 6, 2005
Awards: Huatian Technology Prime Quality Engineering Award
 